Resume of Andishe Sazan Markazi Company in designing FTTH networks
From 1402 to 1404
Employer: Asiatech
Project: Consulting, design of FTTH fiber optic network with a length of 3500 km
In the cities of Shiraz, Tabriz, Mashhad, Khorramabad, Semnan, Borujerd, Najafabad, Yasuj, Lar and Khor, Jahrom, Islamabad West, Eqlid, Garash, Aligudarz, Noorabad Mamasani, Kohdasht, Kangavar, Natanz, Sahneh, Azna, Sarpol Zahab, Estahban, Noorabad Lorestan, Harsin, Fasr Shirin, Daran, Alshtar, Gilan West, Ravansar, Javanroud, Safidasht, Aloni, Qirkarzin
Includes:
Preparation of HLD plan, preparation of LLD plan
ACTIVE PLAN
MD PLAN
CABALE PLAN (RING-FEEDER-DISTRIBUTION)
FUSION PLAN
ODN PLAN
From 1402 to 1403
Employer: Mobin Net
Project: Consulting, designing a 700 km long FTTH fiber optic network in the cities of Ardabil, Sanandaj, Dezful, Marand, and Islamshahr.
Includes:
Preparation of HLD plan, preparation of LLD plan
ACTIVE PLAN
MD PLAN
CABALE PLAN (RING-FEEDER-DISTRIBUTION)
FUSION PLAN
ODN PLAN
From 1402 to 1403
Employer: Shuttle
Project: Consulting, designing 500 km long FTTH fiber optic network in the cities of Tehran, Karaj, Shahreza, Darab, Fasa, Abrisham, Qahdarijan, Soderjan, Ashtarjan, Falavarjan
Includes:
Preparation of HLD plan, preparation of LLD plan
ACTIVE PLAN
MD PLAN
CABALE PLAN (RING-FEEDER-DISTRIBUTION)
FUSION PLAN
ODN PLAN
From 1402 to 1403
Employer: Irancell
Project: Consulting, designing FTTH fiber optic network with a length of 480 km in the cities of Tabriz, Shiraz, Babol, Arak, Marvdasht, Shahrood, Mohammad Shahr, Sabzevar, Pakdasht, Varamin
Includes:
Preparation of HLD plan, preparation of RF plan
MD PLAN
CABALE PLAN (RING-FEEDER-DISTRIBUTION)
FUSION PLAN
ODN PLAN
From 1402 to 1403
Employer: Chabahar Free Zone
Project: Consulting, designing a 150 km long FTTH fiber optic network in the commercial, industrial and residential areas of the Chabahar Free Zone
Includes:
Preparation of HLD plan, preparation of LLD plan
ACTIVE PLAN
MD PLAN
CABALE PLAN (RING-FEEDER-DISTRIBUTION)
FUSION PLAN
ODN PLAN
From 1402 to 1403
Employer: Yazd Desert Pioneers
Project: Design of a 50 km long FTTH fiber optic network in Karaj city
Includes:
Stationary GPS
Year 1403
Employer: Central Region Telecommunications Company
Project: Consulting, designing a 70 km long FTTH fiber optic network in Arak city
Includes:
Preparation of HLD plan, preparation of LLD plan
MD PLAN
From 2019 to 2021
Employer: Kish Free Zone Company – Fanap Telecom Company
Project: Consulting, design and construction of FTTH (fiber to the home) fiber optic network on Kish Island, 130 km long.
Includes:
Preparation of density plan, preparation of feeder cable plan, preparation of distribution cable and drape cable plan
From 2016 to 2017
Employer: Central Region Telecommunications Company
Project: Consulting, FTTH (fiber to the home) fiber optic network designs in the central province (cities of Arak, Saveh, Khomein, Mahallat, Delijan, etc.) for 16,000 subscribers
Includes:
Preparation of density plan, preparation of feeder cable plan, preparation of distribution cable and drape cable plan
Year 2018
Employer: Sabant Company
Project: Consulting and design of FTTH (fiber to the home) fiber optic network in Aalishahr town, Bushehr province, approximately 35 km long.
Includes:
Preparation of density plan, preparation of feeder cable plan, preparation of distribution cable and drape cable plan


